Bill of Materials (BOM)
A Bill of Materials (BOM) is a comprehensive list of the components, quantities, and costs required to manufacture a finished product or assembly. It serves as the master blueprint that defines a product's structure, ensuring accurate cost calculation, seamless inventory management, and efficient production planning.
Overview
-
BOMs define the structure and composition of assembled products.
-
They specify the exact quantities of each component needed to produce one unit of the finished good.
-
BOMs help in accurate cost calculation, inventory management, and production planning.
Where to Access
- Users can access Build of Material (BOM) via Manufacturing column (Manufacturing: BOM)
Key Attributes
Header
-
Name : The internal tracking name or code for this specific BOM.
-
Item *: The final assembled product that this BOM will build.
-
Revision: The current version number to ensure the team is building with the latest specs.
-
Effective Start/End Date : Optional dates to set a timeframe for when this BOM is valid to use.
Component Lines when adding BOM (per row)
-
Item : The specific parts, raw materials, or sub-assemblies needed
-
Description : A short, helpful note explaining what the part is (optional).
-
Quantity : The precise amount of this part needed to build just one single unit of the final product.
-
UOM (Unit of Measure) : How the item is counted or measured (e.g., pieces, ounces, boxes).
-
Unit Cost : The individual price of one unit of this component.
-
Total Cost : Automatically calculated by multiplying the Quantity × Unit Cost.
BOM Rules (optional)
-
Condition : An "if/then" rule that decides when a part should be automatically added (e.g., if color = red).
-
Item : The specific component that gets selected automatically when the condition is met.
-
Description : An optional explanatory note about the rule.
-
Quantity : The amount needed, which can change dynamically using math formulas (e.g., 4+{count}).
-
UOM / Unit Cost : Same meaning as the standard components above.
Use the separate BOM Rules section of the manual for rule syntax and advanced usage.
Overheads (optional)
-
Overhead : Labor/fees recorded as separate lines.
-
Description / Quantity / Unit Cost / Total Cost : Cost capture for non-material elements.
Notes & Files
-
Internal Notes : Free-form instructions or clarifications.
-
Attachments : Drag-and-drop supporting documents (specs, drawings, etc.).
Key Functions
-
Create a BOM : Manufacturing → BOM → New → enter Name , choose Item , set Effective Dates (optional), toggle Default if desired. Add Component Lines (Item, Quantity, UOM, Unit Cost).
-
Add Overheads : Capture labor/fees as Overheads lines for complete costing.
-
Use BOM Rules (optional): Add Condition rows that include components only when rules apply; set Quantity (supports expressions).
-
Maintain accuracy (recommended practice):
-
Ensure all components are correctly identified and quantities are accurate.
-
Review and update BOMs regularly when processes or component costs change.
-
Use base units of measure consistently across the BOM.
-
Include all relevant costs , including labor and overhead , for accurate product costing.
-
For complex products, consider multi-level BOMs with sub-assemblies.
-