Bill of Materials (BOM)

Bill of Materials (BOM)

A Bill of Materials (BOM) is a comprehensive list of the components, quantities, and costs required to manufacture a finished product or assembly. It serves as the master blueprint that defines a product's structure, ensuring accurate cost calculation, seamless inventory management, and efficient production planning.

Overview

  • BOMs define the structure and composition of assembled products.

  • They specify the exact quantities of each component needed to produce one unit of the finished good.

  • BOMs help in accurate cost calculation, inventory management, and production planning.

Where to Access

  • Users can access Build of Material (BOM) via Manufacturing column (Manufacturing: BOM)

Key Attributes

Header
  • Name : The internal tracking name or code for this specific BOM.

  • Item *: The final assembled product that this BOM will build.

  • Revision: The current version number to ensure the team is building with the latest specs.

  • Effective Start/End Date : Optional dates to set a timeframe for when this BOM is valid to use.

Component Lines when adding BOM (per row)
  • Item : The specific parts, raw materials, or sub-assemblies needed

  • Description : A short, helpful note explaining what the part is (optional).

  • Quantity : The precise amount of this part needed to build just one single unit of the final product.

  • UOM (Unit of Measure) : How the item is counted or measured (e.g., pieces, ounces, boxes).

  • Unit Cost : The individual price of one unit of this component.

  • Total Cost : Automatically calculated by multiplying the Quantity × Unit Cost.

BOM Rules (optional)
  • Condition : An "if/then" rule that decides when a part should be automatically added (e.g., if color = red).

  • Item : The specific component that gets selected automatically when the condition is met.

  • Description : An optional explanatory note about the rule.

  • Quantity : The amount needed, which can change dynamically using math formulas (e.g., 4+{count}).

  • UOM / Unit Cost : Same meaning as the standard components above.

Use the separate BOM Rules section of the manual for rule syntax and advanced usage.

Overheads (optional)
  • Overhead : Labor/fees recorded as separate lines.

  • Description / Quantity / Unit Cost / Total Cost : Cost capture for non-material elements.

Notes & Files
  • Internal Notes : Free-form instructions or clarifications.

  • Attachments : Drag-and-drop supporting documents (specs, drawings, etc.).

See It in Action: Exploring a BOM

Watch a walkthrough of an existing Bill of Materials — its header details, component lines, BOM Rules, Overheads, and Notes & Files — all in context.

Key Functions

  • Create a BOM : Manufacturing → BOM → New → enter Name , choose Item , set Effective Dates (optional), toggle Default if desired. Add Component Lines (Item, Quantity, UOM, Unit Cost).

  • Add Overheads : Capture labor/fees as Overheads lines for complete costing.

  • Use BOM Rules (optional): Add Condition rows that include components only when rules apply; set Quantity (supports expressions).

  • Maintain accuracy (recommended practice):

    • Ensure all components are correctly identified and quantities are accurate.

    • Review and update BOMs regularly when processes or component costs change.

    • Use base units of measure consistently across the BOM.

    • Include all relevant costs , including labor and overhead , for accurate product costing.

    • For complex products, consider multi-level BOMs with sub-assemblies.