ianaiERP
Implementation
Log InGet Started

The AI-Native Manufacturing ERP Platform

ianaiERP

ianaiERP unifies ERP, manufacturing execution, warehouse, planning, equipment and HR in one system — configured by AI and live in about 8 weeks.

Platform

  • Platform Overview
  • Inventory Management
  • Warehouse Management System (WMS)
  • Shop Floor Execution (MES)
  • Material Requirements Planning (MRP)
  • Asset Maintenance (CMMS)
  • Order Management & Fulfillment
  • Procurement & Purchasing
  • Financials & Accounting
  • Field Service
  • Project Management
  • AI Financial Officer
  • Workforce & Labor Tracking
  • CRM
  • No-Code Workflow Customization
  • Integrations
  • Reporting

Industries

  • Discrete & Custom Manufacturing
  • Wholesale Distribution ERP
  • Food & Beverage ERP
  • Cosmetics & Personal Care ERP
  • Biopharma Manufacturing ERP
  • Apparel & Fashion ERP

Resources

  • About Us
  • Migrate from QuickBooks
  • AI Implementation
  • Case Studies
  • Blog
  • FAQ
  • User Guide
  • Contact

Contact

  • Address

    1440 N Lakeview Ave
    Anaheim, CA 92807

    Get Directions
  • Emailinfo@ianaierp.com

© 2026 ianaiERP. ianaiERP. All rights reserved.

Privacy PolicyTerms of ServiceLicense
Work Centers

Guides

⌘K

getting-started

  • Introduction to ianaiERPPopular
  • Settings / Preferences
  • Dashboard (List View) & Reports
  • Data Import/Export

inventory

  • ItemPopular
  • Inventory Adjustment
  • Inventory Transfer
  • Lot Tracking
  • Bin Tracking
  • Item Options and Dynamic Templates
  • Serial Tracking

manufacturing

  • Bill of Materials (BOM)
  • Build
  • Routing
  • Operation Definitions
  • Work Orders
  • Work Plan
  • BOM Rule
  • Advanced Manufacturing

purchase

  • Procurement Workflow
  • Vendor
  • Purchase Order
  • Item Receipt
  • Blanket Purchase Order

sales

  • Sales Workflow
  • Customer
  • Estimate
  • Sales Order / Payment
  • Price Rule
  • Blanket Sales Order

shipping

  • Shipment
  • Shipping, Label Printing, and Tracking
  • Carrier Integrations
  • Ship Method Mapping
  • Rule-Based Automation
  • International Shipping
  • Third-Party Billing
  • ianaiERP Bridge
  • Troubleshooting Shipping Issues
  • USPS Cubic Rates in ianaiERP
  • USPS Pricing

return

  • Returns
  • RMA
  • Restock
  • Repair
  • Credit Memo
  • Refund

miscellaneous-setup

  • Miscellaneous

customization

  • Custom Field
  • Custom Script
  • Vendor-Item Catalog
  • Units of Measure (UOM)

integration

  • Quickbooks Online Integration
  • Bigcommerce Integration
  • Shopify Integration

accounting

  • Journal
  • Transfer Funds
  • Bank Deposit
  • Expense
  • Chart of Accounts

equipment

  • Introduction
  • Equipment Hub
  • Work Centers
  • Resources & Resource Pools
  • Work Centers for CAPA
  • Asset Management
  • Maintenance Hub
  • Preventive Maintenance
  • Maintenance Events
  • Spare Parts & Consumables
  • Capacity Planner
  • Runtime Status
  • Permissions & Modules

planning

  • Supply-Demand Intelligence (Overview)
  • SDI Dashboard
  • Demand & Supply
  • Shortages & Impact
  • Planning View
  • Make vs Buy
  • Creating Purchase Orders
  • Demand Forecasting
  • Production Scheduling (Overview)
  • Schedule Views
  • Scheduling Work Orders
  • Capacity, Bottlenecks & Batching
  • Manufacturing Cockpit

project

  • Introduction
  • Projects & the Workspace
  • Tasks & the Work Tab
  • Budgeting
  • Estimates & Contracts
  • Time Tracking & Timesheets
  • Resource Planning
  • Daily Logs
  • Files & Floor Plans

hr

  • Introduction
  • People & Team
  • Onboarding
  • Daily Hub & Shifts
  • Time Off & Leave
  • Broadcasts & Certificates
  • Payroll Overview
  • Payroll Tax & Compliance
  • Year-End & Severance
  • Benefits
  • HR Settings
  • Permissions & Setup Wizard

field-service

  • Introduction
  • Service Agreements
  • Service Requests & Dispatch
  • Request Templates
  • Workforce & Scheduling

tax

  • Sales Tax Setup
  1. Home
  2. User Guide
  3. Work Centers

Work Centers

A Work Center is a shared definition that routings point at and rates live on — visible to every company in the tenant, while the machines inside it are owned per company. It's the bridge between a routing's "where does this happen" and the actual capacity available to run it.

Overview

  • Shared, Not Duplicated: One work center definition (e.g., "Laser") is visible tenant-wide, so routings reference a consistent name and rate structure no matter which company is scheduling against it.
  • Per-Company Ownership: The machines and people assigned to a work center are added under Resources and belong to a specific company, even though the work center itself is shared.
  • Capacity Source of Truth: Rated hours, OEE target, availability, and default setup all live here, feeding directly into scheduling and the Capacity Planner.

Click through the walkthrough below to see a work center get configured, including assigning a resource to it.

Where to Access

  • Users (admin / common) can access it via Equipment → Resources → Work Centers tab
  • Related tabs on the same page: Floor, Resources, Resource Pools, Work Centers
  • Click Add New to create a new work center

Creating a Work Center

To create a new work center:

  1. Navigate to Equipment → Resources, then select the Work Centers tab.
  2. Click Add New.
  3. Enter the basic information — Name, Code, Location, and Work Center Type.
  4. Configure Hourly Cost Rates and Capacity Parameters.
  5. Assign the machines or people this work center will use.
  6. Save.

Work Center Components

Basic

FieldDescription
NameThe work center's display name (e.g., "Laser").
CodeUnique identifier for the work center.
Active (toggle)Controls whether the work center is available for scheduling.
LocationThe physical site this work center belongs to.
DepartmentOptional department link — the only path by which departmental overhead reaches an item's standard cost.
Work Center TypeClassifies the work center (e.g., Manufacturing, Assembly).
Status OverrideAn optional manual state for the whole work center; if left unset, status is derived from its resources.
DescriptionFree-text description of the work center.

Hourly Cost Rates

FieldDescription
Rate ScopeWhether rates come from the Tenant default or a specific company scope. Company rates override tenant defaults, and selecting a scope loads that scope's own rows for editing.
Rate rowsThe actual hourly rates configured for this work center, added via the + button; shows "No hourly rates configured" until at least one is added.

Capacity Parameters

FieldDescription
Machine SpeedTheoretical maximum throughput at 100% efficiency.
Rated Hours / DayThe work center's operating window per day.
OEE TargetPlanning OEE factor — a target used for planning, not a measured value.
AvailabilityExpected availability after planned downtime.
Default SetupDefault changeover time used in capacity calculations when an operation doesn't specify its own.
Critical for CAPA dashboard (toggle)Includes this work center in the nightly capacity snapshot and dashboard heatmap.

Current Status

FieldDescription
StatusRolls up automatically once assets are linked to this work center; shows "No status yet" until then.
Current UtilizationLive utilization percentage for this work center.

Resources in This Work Center

FieldDescription
Assign machine or personOpens a New Resource form to add a machine or person directly to this work center.
Resource chipsEach assigned resource is shown with its code, name, and scheduling role (e.g., "TITAN LS1630 · PRIMARY MACHINE").

Work Center Cost Calculation

Work centers are essential for accurate cost calculation in manufacturing:

  • Configure Hourly Cost Rates on each work center, scoped to the tenant default or overridden per company.
  • These rates flow through to routing operations and ultimately to work orders — Reference Hourly Rate on an individual resource is metadata only; Work Orders absorb the Work Center's rate, not the resource's.

Work Center Scheduling

The system uses work center information for production scheduling:

  1. Available capacity is determined from Rated Hours/Day, Availability, and OEE Target.
  2. Operations are assigned to work centers based on routing specifications.
  3. From Production Scheduling's Resources view, operations can be assigned to a specific resource within the work center, or left on "Any resource" for the scheduler to pick from what's available.
  4. Current Status and Current Utilization give a live read on load, helping identify bottlenecks before they cause delays.

Assigning a Resource to a Work Center

Clicking Assign machine or person opens a full resource record rather than a simple picker, so you can create a new resource on the spot:

SectionWhat it covers
BasicName, Kind, Code, Scheduling Role (e.g., Primary Machine), Critical toggle (downtime here takes the whole work center offline).
PlacementWork Center (pre-filled), Parent Resource, Location, Department, Asset link, Workforce link (for people).
CapacityParallel Jobs, Rated Hours/Day, Efficiency, OEE Target, Default Setup, Speed, Reference Hourly Rate — leave any of these blank and the resource inherits it from the work center.
ServiceOperating Hours (accrues automatically while Running), Cycle Count, Last Inspection, Next Service, Warranty Until.

Integration with Other Features

Work centers connect with other manufacturing functions:

  • Resources & Resource Pools : The machines, labor, and tools owned per company and assigned to a work center.
  • Routings : Define which operations are performed at which work centers.
  • Production Scheduling : Schedule production using the work center's capacity and its individual resources.
  • Cost Accounting : Calculate accurate manufacturing costs from work center rates.

Best Practices

  1. Create work centers with the appropriate level of granularity for your operations.
  2. Regularly update Hourly Cost Rates to maintain accurate product costing.
  3. Use Critical for CAPA dashboard on the work centers that genuinely can't afford downtime, so they surface in the nightly heatmap.
  4. Configure realistic Rated Hours/Day and Availability to prevent over-scheduling.
  5. Let individual resources inherit capacity from the work center by default — only override Rated Hours/Day, Efficiency, or Setup on a resource when it genuinely differs from the rest of its work center.

Related Features

  • Resources & Resource Pools
  • Routing
  • Work Orders
  • Bill of Materials (BOM)

For more detailed information on advanced work center management techniques and optimization, please refer to the specific sections in this documentation.

PreviousEquipment HubNext Resources & Resource Pools